VYSABL← BACK TO WORK

SELECTED WORK / DIRECT VYSABL PROJECT

Paddington Station.
DELTA hoardings.

A large public-facing site. Complex access. Changing permissions. One accountable production partner.

DELTA branded hoardings at Paddington Station, original finished-site photograph

01 / FINISHED INSTALLATION

PROJECT SCOPE

From survey to installation.

VYSABL managed and delivered the complete print and production package for an additional phase of DELTA branded hoardings at Paddington Station. Our work covered site surveys, material and technical specifications, print production, installation and overall project management.

SITE SURVEYS · MATERIAL SPECIFICATION · PRINT PRODUCTION · INSTALLATION · PROJECT MANAGEMENT

DELTA hoarding graphics continuing around a corner at Paddington Station

02 / CORNER DETAIL AND GRAPHIC CONTINUITY

THE PRODUCTION CHALLENGES

Making it work on a live site.

01 / Access and logistics

Paddington is a large and busy site, with loading and unloading points not always directly connected to the working area. Moving materials and coordinating installation around a public thoroughfare brought its own access and control requirements.

02 / Changing site management

This phase followed earlier work on the developing site. Ownership and management arrangements had changed, making responsibility for some permissions and final sign-offs less clear. Production coordination had to account for that uncertainty alongside the physical work.

THE VYSABL APPROACH

Production is more than print.

Materials, site conditions, access, permissions and communication are all part of delivering physical branded environments. At Paddington, VYSABL brought those requirements together through one production-led management approach.

DISCUSS A PROJECT ↗   ← BACK TO SELECTED WORK